空分之家

 找回密码
加入空分之家

QQ登录

只需一步,快速开始

微信登录

微信扫码,快速开始

查看: 2317|回复: 0

基于价值的含大规模风电电力规划评估

[复制链接]
发表于 2011-12-8 01:11:37 | 显示全部楼层 |阅读模式

马上注册,学习空分知识,结交更多空分大神!

您需要 登录 才可以下载或查看,没有帐号?加入空分之家

x
[1]余贻鑫,周金辉,秦 超. 基于价值的含大规模风电电力规划评估[J].天津大学学报(自然科学版),2011,11:941-947.
 YU Yi-xin,ZHOU Jin-hui,QIN Chao. Value-Based Evaluation of Power System Planning Alternatives with Large-Scale Wind Power[J].Journal of Tianjin University,2011,11:941-947.
《天津大学学报(自然科学版)》[ISSN:0493—2137/CN:12—1127/N]期数: 2011年11 页码: 941-947 栏目: 电气与自动化工程 出版日期: 2011-11-15
文章信息/Info
Title:  Value-Based Evaluation of Power System Planning Alternatives with Large-Scale Wind Power
作者:  余贻鑫; 周金辉; 秦 超
天津大学智能电网教育部重点实验室,天津 300072
Author(s):  YU Yi-xin; ZHOU Jin-hui; QIN Chao
Key Laboratory of Smart Grid of Ministry of Education,Tianjin University,Tianjin 300072,China
关键词:  ; 大规模风电; 全社会成本; 价值评估; 电力规划
Keywords:  ; large-scale wind power; total social cost; value-based evaluation; power system planning
分类号: TM715
DOI: -
文献标识码: A
摘要:  从全社会成本视角出发,构建了含大规模风电的电力规划方案评估的总体框架.其中,为计及风电出力波动性的影响,针对给定的规划方案和全年时序的风电出力与负荷数据,通过内嵌机组组合优化模型、计及静态和动态安全约束的经济调度模型(动态安全域边界的超平面形式可使动态安全约束处理难的问题变得十分简易)及校正性控制模型,实现系统运行过程的模拟,从而可详细评估全年每小时的系统燃料、环境、网损成本以及系统可靠性成本.再结合电源的容量成本和电网成本,则可获得方案的全社会成本,实现规划方案的全社会成本评估.最后通过示例分析验证了方法的有效性.
Abstract:  From the perspective of the total social cost,the overall framework of evaluation of power system plan-ning with large-scale wind farms was established. According to the annual chronological hourly data of wind power and load,for a given power system planning alternative,its system operation simulation was carried out,wherethe variability of wind power was considered. In the simulation process,daily-ahead(or week-ahead)unit commitment model,steady state and dynamic secutiy constraints based economic dispatch model and remedial control model were included. It was emphasized that based on the hyper-plane description of the bounary of the practical dynamic securityregion(PDSR),the difficulty of dealing with stability constraints in the problem of solving for steady state and dy-namic secutiy constrained economic dispatch can be overcome easily. Hence the hourly fuel,environmental and net-work loss cost in the year for the given planning alternative could be calculated. These costs were to be combined with generation capacity cost,power network cost and system reliability cost,so that the total social cost of the alterna-tive could be determined. Therefore the evaluation of the total social cost of an alternative was achieved. Finally,the proposed method was validated by means of the case studied.
e360867f-9cf0-410a-a88b-5770fcd72767.pdf (870.13 KB, 下载次数: 1)


                               
登录/注册后可看大图
该贴已经同步到 kongfen的微博
您需要登录后才可以回帖 登录 | 加入空分之家

本版积分规则

关闭

站长推荐上一条 /1 下一条

快速回复 返回列表 客服中心

帮助文档|清除痕迹|广告位|Archiver|手机版|小黑屋|空分之家 ( 鲁ICP备10016836 )

GMT+8, 2024-4-26 04:47 , Processed in 0.100226 second(s), 31 queries .

Powered by Discuz! X3.4

Copyright © 2001-2021, Tencent Cloud.

快速回复 返回顶部 返回列表